The SABO Environmental Team successfully installed the line for the company Atlas Tapes, with a planned input capacity of up to 16 tons per hour.
Scope of supply:
Design of the line
Electromechanical installation of the line
Manufacturing and procurement of screw feeders
Magnetic separator
Star screen
205m of fully enclosed conveying systems to avoid the dispersion of dust
Metallic structures
This project will play a key role in enhancing energy production within the existing industrial facility!