top of page

SABO x MESOGEOS S.A.

  • 4 hours ago
  • 1 min read

SABO Environmental is excited to announce a cooperation agreement with MESOGEOS SA to build a Waste Treatment Plant (WTP) in Trikala as part of an integrated waste management solution.

A cooperation agreement with MESOGEOS SA

About the Unit:

  • It is intended to manage municipal waste in Western Thessaly

  • It is expected to process on an annual basis 43,5k tons of mixed Municipal Recyclable Materials (PSM) and 13,5k tons of Pre-Selected Organic Waste (POW)

SABO Environmental Team undertook:

The design, construction, installation, and optimization of the technological line for the Mechanical Sorting Unit and the Pre-Selected Organics Unit, as well as the electromechanical equipment, carried out within SABO's vertically integrated Production Unit.


Goal:

The project is expected to be completed in 2026.

We are proud to contribute to the environmental enhancement of Thessaly, supporting its residents' well-being while reducing the country's energy footprint.

Logotype of SABO S.A.
  • LinkedIn
  • YouTube
  • Facebook
Subscribe to our Newsletter. Never miss an update!
Logo «ΕΛΛΑ-ΔΙΚΑ ΜΑΣ»
Copyright ©2024 SABO S.A. All rights reserved.
Headquarters +30 22210 51805-9 Greece
G.E.C.R. 130604522000
Powered by DESIGNATURE
e-bannersEUERDF180X90.jpg
bottom of page