SABO x MESOGEOS S.A.
- 4 hours ago
- 1 min read
SABO Environmental is excited to announce a cooperation agreement with MESOGEOS SA to build a Waste Treatment Plant (WTP) in Trikala as part of an integrated waste management solution.

About the Unit:
It is intended to manage municipal waste in Western Thessaly
It is expected to process on an annual basis 43,5k tons of mixed Municipal Recyclable Materials (PSM) and 13,5k tons of Pre-Selected Organic Waste (POW)
SABO Environmental Team undertook:
The design, construction, installation, and optimization of the technological line for the Mechanical Sorting Unit and the Pre-Selected Organics Unit, as well as the electromechanical equipment, carried out within SABO's vertically integrated Production Unit.
Goal:
The project is expected to be completed in 2026.
We are proud to contribute to the environmental enhancement of Thessaly, supporting its residents' well-being while reducing the country's energy footprint.